![ICON Engineering - ICON works in with operators and support contractors to ensure well test equipment is adequately restrained on deck. ICON Engineering - ICON works in with operators and support contractors to ensure well test equipment is adequately restrained on deck.](https://www.iconeng.com.au/image/c0af88c1fe62d7d0f29f2fc0345dd4bf_960_600_cropped.jpg)
ICON Engineering - ICON works in with operators and support contractors to ensure well test equipment is adequately restrained on deck.
![Electric railway journal . te, were erected witha standard 75-ton wrecking derrick, fitted with a special 90-ft.boom capable of lifting either the steel or concrete poles ata point 90 ft. from Electric railway journal . te, were erected witha standard 75-ton wrecking derrick, fitted with a special 90-ft.boom capable of lifting either the steel or concrete poles ata point 90 ft. from](https://c8.alamy.com/comp/2CRAHRT/electric-railway-journal-te-were-erected-witha-standard-75-ton-wrecking-derrick-fitted-with-a-special-90-ftboom-capable-of-lifting-either-the-steel-or-concrete-poles-ata-point-90-ft-from-the-center-of-the-track-the-concretepoles-were-lifted-from-the-cars-on-which-they-were-loadedand-placed-on-timber-horses-adjacent-to-the-excavation-wherethey-were-to-be-set-the-cross-arms-and-grillage-were-thenput-in-place-and-the-pole-thus-equipped-was-picked-up-at-thetop-and-lowered-into-the-excavation-the-steel-poles-werepicked-up-from-the-embankment-where-they-had-been-un-loaded-and-lifted-2CRAHRT.jpg)
Electric railway journal . te, were erected witha standard 75-ton wrecking derrick, fitted with a special 90-ft.boom capable of lifting either the steel or concrete poles ata point 90 ft. from
![Study on the fatigue performance of steel-composite grillage deck of large-span arch bridge - Extrica Study on the fatigue performance of steel-composite grillage deck of large-span arch bridge - Extrica](https://static-01.extrica.com/articles/23344/23344-img5.jpg)
Study on the fatigue performance of steel-composite grillage deck of large-span arch bridge - Extrica
![Study on the fatigue performance of steel-composite grillage deck of large-span arch bridge - Extrica Study on the fatigue performance of steel-composite grillage deck of large-span arch bridge - Extrica](https://static-01.extrica.com/articles/23344/23344-gabs-1200x498.webp)
Study on the fatigue performance of steel-composite grillage deck of large-span arch bridge - Extrica
Derrick Cranes Specialized Application Cranes For Sale in SYDNEY, NEW SOUTH WALES, Australia - 1 Listings | MarketBook Canada
![ICON Engineering - ICON works in with operators and support contractors to ensure well test equipment is adequately restrained on deck. ICON Engineering - ICON works in with operators and support contractors to ensure well test equipment is adequately restrained on deck.](https://www.iconeng.com.au/image/2fba5e0439902c28979cde5988b5cf0f_960_600_cropped.jpg)
ICON Engineering - ICON works in with operators and support contractors to ensure well test equipment is adequately restrained on deck.
![ICON Engineering - ICON works in with operators and support contractors to ensure well test equipment is adequately restrained on deck. ICON Engineering - ICON works in with operators and support contractors to ensure well test equipment is adequately restrained on deck.](https://www.iconeng.com.au/image/61a66a60e7ce45f74044328f2ca875de_960_600_cropped.jpg)
ICON Engineering - ICON works in with operators and support contractors to ensure well test equipment is adequately restrained on deck.
![US8312828B2 - Preloading to reduce loads and save steel on topsides and grillage of catamaran systems - Google Patents US8312828B2 - Preloading to reduce loads and save steel on topsides and grillage of catamaran systems - Google Patents](https://patentimages.storage.googleapis.com/f4/47/cb/ee10fb62edc92c/US08312828-20121120-D00000.png)